Skip to main content

Hitachi-Rail.com Hitachi Railway Systems Website

Hitachi

A railway car running through a tunnel is repeatedly worked out by the load caused through in/out pressure difference. Fatigue testing with actual car body under a pressure load is carried out with the use of a fatigue testing apparatus.

Photo of the Fatigue testing machine

  1. Actual car body
  2. Main tank
  3. Pressure reducing tank
  4. Pressure feeding tank
  5. Measuring room