Jump to the main text

Hitachi-Rail.com

Hitachi

11 December 2006

CG of Raliance Rail PPP Train

Hitachi's Industrial Systems (Vice President and Executive Officer: Gaku Suzuki) and Hitachi Australia Pty Ltd.(Managing Director: Yutaka Sugihara), together with the Australian train manufacturer, EDI Rail, concluded a contract with Reliance Rail for 78 eight-car double deck sets and two spare carriages (626 cars) for the Sydney train operator, RailCorp. In a joint venture arrangement, EDI Rail will be responsible for the car body and bogie, and Hitachi will be in charge of the propulsion system on behalf of Reliance Rail. The new fleet will be introduced to the network by 2013, and will be replacing 498 non air-conditioned carriages.

This project is a Public Private Partnership (PPP), where a special purpose company (Reliance Rail Pty Ltd.) has been established by private companies for the execution of the project, making use of the private fund and know-how. Reliance Rail will finance the project, along with designing, manufacturing and maintaining the fleet for operation on RailCorp's Sydney suburban network. This project has already drawn much attention as Australia's biggest Public Private Partnership Project.

Hitachi has succeeded in winning the Channel Train Rail Link high speed train project in the UK, a contract for 29 trainsets (174 cars) that concluded in 2005.Other recent overseas contracts include the Dubai monorail system (2006) and substation for Taiwan (2006). Hitachi will continue its challenge for further expansion of its global railway business.